Jiaomen Xi (W)

Jiaomen Xi (W)

Barrier-free Facilities

Emergency Call Equipment

Both north and south ends of the platform,inside the barrier-free toilet,the lift from the platform to the concourse,outside the control room, lift at Entrance A, Entrance D

Barrier-free Toilets

Close to the end of the train bound for Tiangong Yuan

Elevators

Platform to concourse,Entrance A

Ramps

Outside the lift near Entrance A

Station Facilities

Toilets

Close to the end of the train bound for Tiangong Yuan

Ticket Vending Machines

South Concourse(Entrance C, Entrance D)
North Concourse(Entrance A, Entrance B)

Control Room

South Concourse(Entrance C, Entrance D)

Police Office

South Concourse(Entrance C, Entrance D)

Customer Service Centre

South Concourse(Entrance C, Entrance D)
North Concourse(Entrance A, Entrance B)

Automatic photo booth

North concourse (near the wall besides the escalator)

Toy vending machine

North concourse (near the wall besides the escalator)

Automatic water vending machine

South concourse (near the wall besides the escalator)
North concourse (near the wall besides the escalator)

AED

South of platform

Jiaomen Xi (W)

Map

Directions and Coordinates

Jiaomen Xi (W)

Jiaomen Xi (W)

Notice

The following timetable will be adopted since the first train on September 1, 2024.

Timetable

Line 4-Daxing LineJiaomen Xi (W)时刻表
Line 4-Daxing LineJiaomen Xi (W)时刻表
Line 4-Daxing LineJiaomen Xi (W)时刻表
Line 4-Daxing LineJiaomen Xi (W)时刻表